GORACON equipped 15 lecture halls with PODIUM in the University of Applied Sciences Northwestern Switzerland

The location in Muttenz will be expanded and becomes even more important as an educational location for this region. 1.700 additional university places are planned for the 34.500qm area.

The basis for this was provided by GORACON

With the ascending platform construction PODIUM, the basis for further interior construction was established. On basis of a detailed planning, the system, made of a steel substructure and a calcium-sulfate base plate, was nearly 100% pre-assembled.
Within a period of approximately 2.5 month, the system with a total area of 1.170 qm was installed in 15 lecture halls.

Technical specialties, like the static connection with the chairs, bridging of electric mains and wire ways were already considered during the construction period by our engineers, so that a trouble-free assembly was the result.

  • Logo der FHNW Muttenz
  • Campus FHNW Muttenz
  • SERVICES
  • Platform construction for 15 lecture halls
  • SPECIAL FEATURES
  • Static connection with chairs
  • Bridging of electric mains
  • DATE OF SERVICE
  • 04/2017 – 11/2017
Steel substructure (Hilti) factory pre-assembled


Steel substructure (Hilti) factory pre-assembled

Mounted as plug-in and screw connection on the bare floor


Mounted as plug-in and screw connection on the bare floor

Ready-laid floor covering made of calcium sulphate plates (Knauf Integral)

Ready-laid floor covering made of calcium sulphate plates (Knauf Integral)

Integration of chair fixtures in the system PODIUM


Integration of chair fixtures in the system PODIUM

Auditorium in the finished state


Auditorium in the finished state

Auditoriuim seating with continuous table construction and swiveling double seats

Auditoriuim seating with continuous table construction and swiveling double seats