menu
 

The cinema in the Duderstädter Filmcenter Feilenfabrik was extended by building of 3 new cinema halls.

The ascending floor construction PODIUM for around 330 new seats was installed by goracon. One of the halls is supposed to be equipped with 3-D-technology.

PODIUM convinced by its product features:

  • check Detailed preliminary planning
  • check nearly 100% pre-assembly
  • check compliance with high fire safety requirementscompliance with high fire safety requirements
  • check short assembly time due to modular system
  • check installation right before installation of chairs
  • Logo Movietown Eichsfeld
  • Movietown Eichsfeld
    Filmcenter Feilenfabrik Duderstadt
  • SERVICES
  • Platform construction for 3 cinema halls
  • SPECIAL FEATURES
  • Static connection with chairs
  • DATE OF SERVICE
  • 03/2018 – 05/2018
steel substructure (secial feature: overbuilding of existing pipelines)

steel substructure (secial feature: overbuilding of existing pipelines)

Deck covering laid as tongue and groove construction


Deck covering laid as tongue and groove construction

Installation of calcium sulphate plates (Knauf Integral)

Installation of calcium sulphate plates (Knauf Integral)

Ventilation cut-outs in the setting stages are already inserted in the deck covering at the factory

Ventilation cut-outs in the setting stages are already inserted in the deck covering at the factory